Nationwide Delivery & Site Preparation

Container Delivery & Site Preparation Guide

We deliver shipping containers to all 50 states with professional placement. Learn about delivery options, timelines, site preparation requirements, and foundation choices to ensure a smooth, successful delivery.

Donald J. Graham discussing an arranged site-preparation project with a client while the Outback crew prepares and finishes a concrete container pad
Donald J. Graham reviews an active concrete-pad job with the client — part of a paid site-preparation service — while the Outback site crew levels and finishes the placement area.

Site preparation — who does what

Site Readiness: Prepared by You — or by Our Crew

To be clear: site preparation is done by you, the customer. Outback does not perform site work automatically — your delivery covers transporting and placing the container, not preparing the ground. In her on-site video, Donna Jean Graham explains exactly what you need to do to prepare your site, from clearing and leveling the placement area to confirming safe truck access before delivery day.

Prefer to leave it to us? You can pay Outback to prepare the site for you as an arranged service — we come out and do the work. The photo shows one of these arranged projects: Donald J. Graham reviewing the site with the client while our crew forms, levels, and finishes the concrete pad. Final foundation design, reinforcement, drainage, and permits remain subject to the project requirements and the appropriate local professionals.

  • A level, compacted placement area, prepared by you
  • Clear truck access and overhead clearance on delivery day
  • Permits, drainage, and utilities arranged before delivery
Simple Process

How Delivery Works

Delivering a jobsite office? Review our shipping container office site-prep checklist before your delivery date.

01

Order

Place your order online or by phone. Confirm container type, size, and condition.

02

Coordinate

Our logistics team contacts you within 1 business day to arrange delivery details and schedule.

03

Transport

Container ships via tilt-bed or flatbed truck with a professional driver trained in container placement.

04

Placement

Professional placement at your desired location. Driver ensures level positioning before departure.

Delivery Methods

Delivery Options

Most Popular

Free Standard Delivery

FREE

Complimentary ground delivery — included at no cost. Handling 1-3 business days · Transit 7-12 business days. Available throughout the continental United States. No crane, forklift, or customer unloading equipment required.

Express

Tilt Bed Truck — Express

$350

Flat rate ($1,500 for container homes). Handling 1-3 business days · Transit 4-7 business days. Faster express transit than free standard (7-12 business days). Container is tilted off the truck directly onto the ground — no crane required.

Express

Flatbed Truck — Express

$450

Flat rate ($2,500 for container homes). Handling 1-3 business days · Transit 4-7 business days — express transit. Used for Alaska, Hawaii, Puerto Rico, and mainland sites where tilt-bed access is not available. Outback coordinates and provides all required offloading equipment.

Handling Time
1-3 Business Days
Transit Time
4-7 Business Days
Estimated Delivery
5-10 Business Days
Coast to Coast

Delivery Timelines by Region

We deliver to all 50 states. Timelines vary by region and site accessibility.

West Coast

CA, OR, WA, NV, AZ

5-10 Business Days

Mountain

CO, UT, MT, ID, WY, NM

5-10 Business Days

Midwest

IL, OH, MI, MN, WI, IN, IA, MO

5-10 Business Days

South

TX, FL, GA, NC, SC, TN, AL, LA

5-10 Business Days

Northeast

NY, PA, NJ, MA, CT, ME

5-10 Business Days

Plains

KS, NE, SD, ND, OK, AR

5-10 Business Days
Prepare Your Site

Site Preparation Guide

Proper site preparation ensures safe delivery, level placement, and long-term structural integrity. Follow our comprehensive guide below.

Foundation Options

Choose the Right Foundation

A proper foundation prevents settling, moisture damage, and door misalignment. Choose based on your intended use and placement duration.

Concrete Pad

Most permanent and stable option. Best for long-term or permanent placement. Requires pouring concrete in advance.

Preparation

Pour 4–6" reinforced concrete pad, slightly larger than the container footprint.

Gravel Bed

Cost-effective with excellent drainage. Good for semi-permanent placement. Quick to prepare.

Preparation

Lay 4–6" of compacted 3/4" minus gravel on level ground.

Railroad Ties

Elevates container off the ground, preventing moisture damage. Durable and long-lasting.

Preparation

Place treated railroad ties at each corner and every 8ft along the length.

Concrete Blocks

Quick, adjustable, and budget-friendly. Ideal for temporary placement or leveling uneven ground.

Preparation

Place solid concrete blocks at corners and mid-points; level with shims.

Step by Step

Site Preparation Steps

01

Choose Location

Select a level area with adequate access for the delivery truck.

02

Clear Site

Remove debris, vegetation, rocks, and any overhead obstructions.

03

Level Ground

Ensure the surface is level using a spirit or laser level for accuracy.

04

Compact Soil

Compact the soil to prevent settling. Add gravel or pour concrete as needed.

05

Install Foundation

Place your chosen foundation — concrete pad, gravel, ties, or blocks.

06

Final Check

Verify access path, clearance, and overall site readiness for delivery.

Access Requirements

Minimum 12ft wide access path for truck entry
Minimum 75ft straight approach for tilt-bed trailer
No overhead obstructions (power lines, branches, awnings)
Adequate turning radius for truck and trailer (60ft min)
Firm, stable surface supporting 40,000+ lbs truck weight
No steep grades or ditches in the delivery path
Clear line of sight for the driver during placement
Gates or fences opened wide enough for truck passage

Site Clearance Guide

20ft Container
Footprint
20' × 8'
Clearance
Allow 25' × 13' total area
40ft Container
Footprint
40' × 8'
Clearance
Allow 45' × 13' total area
40ft High Cube
Footprint
40' × 8' (9'6" tall)
Clearance
Allow 11' overhead clearance

Always allow 3–5ft clearance on all sides for maintenance access and door swing.

Permit & Compliance Checklist

Check local zoning requirements for container placement
Building permits may be required for permanent structures
Review HOA restrictions and CC&Rs if applicable
Verify setback requirements from property lines
Check for utility easements on your property
Some areas require engineering stamps for container structures
Contact your local building department for specific requirements
Questions & Answers

Delivery FAQ

Business Information

About Our Company

Outback Shipping Containers LLC is a registered, licensed, and insured business based in Houston, Texas. We deliver nationwide with full compliance with all consumer protection and shipping policies.

Legal Entity
Outback Shipping Containers LLC
Headquarters
10000 Wallisville Rd, Houston, TX 77013
Business Hours
Mon–Fri: 8:00 AM – 6:00 PM CT
Service Area
Nationwide delivery to all 50 states
Licensed & Insured
BBB A+ Accredited
5+ Years Established
USA Owned & Operated
All 50 States
Flexible Financing